Where to Find Required Mechanical Acceptance Testing In The Plans

Written by Vortex Air Balance Staff – 21 min read

Mechanical plans displaying NRCC-MCH Title 24 compliance forms used to identify required mechanical acceptance testing, with a hard hat, ruler, pencil, calculator, and rooftop HVAC equipment.

California mechanical plans can be difficult to navigate and understand, especially when it comes to Title 24 compliance requirements.

 

What makes things even more confusing is trying to find something when you may not even know the requirement exists, let alone what the forms actually look like.

 

Many contractors and building owners are unfamiliar with Mechanical Acceptance Testing and NRCA-MCH forms, which are part of California’s Title 24 requirements for certain commercial HVAC installations.

 

As a result, these requirements can easily be overlooked until a building inspector requests the completed acceptance forms.

 

So, how can you determine whether your project requires Mechanical Acceptance Testing? Where do you find the required NRCA-MCH forms in your plans, and what do these documents look like?

 

In this guide, we’ll show you exactly what to look for, where to find it, and how to identify the forms your project requires using real examples from California mechanical plans.

Table of Contents

Step 1: Locate the NRCC-MCH Certificate of Compliance

Start by opening your project’s approved construction plans and locating the Title 24 Mechanical Certificate of Compliance, typically identified as NRCC-MCH.

 

Depending on how the plans are organized, these documents may appear within the Mechanical Sheets (M-Sheets) or in a separate Title 24/Energy Compliance section (T-Sheets).

 

Look for the heading “Mechanical Systems – Certificate of Compliance” and the NRCC-MCH form designation, as highlighted in the example below.

An example and screenshot showing what to look for when looking for the Mechanical Systems NRCC-MCH pages in the building plans, the first step to determining if mechanical acceptance testing is required.

The example above shows an NRCC-MCH Certificate of Compliance included within the mechanical portion of the construction plans.

 

Once you’ve located this document, you’re in the right place to identify your project’s Mechanical Acceptance Testing requirements.

 

Next, we’ll show you exactly where to find the Declaration of Required Certificates of Acceptance, which lists the NRCA-MCH forms your project requires.

Step 2: Locate the Declaration of Required Certificates of Acceptance

Once you’ve located the NRCC-MCH Certificate of Compliance, navigate through its pages until you find the Declaration of Required Certificates of Acceptance section.

 

This declaration identifies the NRCA-MCH forms associated with your project’s required Mechanical Acceptance Testing. 

 

The example below highlights the declaration and the information you’ll need to identify which tests apply to your project.

Example and screenshot of what the declaration of required certificates of acceptance look like in the plans and where to find them to determine if mechanical acceptance testing is required for an HVAC project.

Under the Form/Title column, you’ll find the required NRCA-MCH form numbers and descriptions. For example, NRCA-MCH-02-A — Outdoor Air is one of the acceptance tests listed in the image above. 

 

The adjacent Systems/Spaces to Be Field Verified column identifies which HVAC equipment requires that test, such as RTU-1 through RTU-5.

 

Important Note: A single NRCA-MCH form listed in the declaration does not necessarily represent only one test. The same acceptance test may be required for multiple HVAC systems, with each applicable unit requiring its own testing and documentation.

 

Equipment may be identified by system tags (RTU-1, MAU-1, FC-1, etc.) or by model numbers. For example, if five rooftop units share the same model number, all five will typically require the listed acceptance test—not just one.

 

Similarly, larger multifamily projects may reuse equipment tags, such as FC-1, across dozens of identical apartments or floor plans. Even though these systems share the same designation, they represent separate physical units that will each require testing and their own individual form.

 

On larger projects, the Declaration of Required Certificates of Acceptance may also span several pages. One page might list NRCA-MCH-02-A for 20 rooftop units, while another lists NRCA-MCH-05-A for those same units. 

 

Different acceptance requirements may appear on separate sheets, so it’s important to review the entire declaration.

 

Once you’ve identified that your project requires Mechanical Acceptance Testing, the next step is to contact a Certified Mechanical Acceptance Test Technician (CMATT). The technician can review the plans, determine which tests apply to each system, and provide an accurate estimate for the required services.

Additional Mechanical Testing Requirements to Look Out For In the Declaration Pages

Once you’ve located the declaration pages and confirmed that your project requires Mechanical Acceptance Testing, there are two additional Title 24 compliance requirements you should check before moving forward.

 

Mechanical Certificates of Acceptance (NRCA-MCH) are not the only requirements identified in these documents. In fact, additional installation and verification requirements appear right alongside the acceptance testing requirements in the NRCC-MCH documentation so you might as well check them out now. 

 

Overlooking them could send you right back to square one, facing unexpected expenses and delays in obtaining final inspection approval.

 

The NRCC-MCH documentation always contains three declaration sections: Certificates of Installation, Certificates of Acceptance, and Certificates of Verification. All three sections are included, even when no forms are required under a particular category.

 

Having covered the Certificates of Acceptance, let’s take a closer look at the other two declarations. Understanding what they represent and who is responsible for completing them can help prevent another unexpected requirement from catching you off guard.

Declaration of Required Certificates of Installation

Let’s start with the Declaration of Required Certificates of Installation, which identifies the NRCI-MCH forms required for your project.


These forms document that applicable HVAC equipment and components were installed in accordance with California’s Title 24 Energy Standards. The installing mechanical contractor is typically responsible for completing them.


To identify the required installation certificates, locate the declaration section and review the forms listed under Form/Title, as highlighted in the example below.

Example and screenshot of the Declaration of required certificates of installation and where its shown in the mechanical plans.

In this example, the NRCI-MCH-01-E form is listed as a required Certificate of Installation.

 

This form documents applicable mechanical installation requirements and is commonly included in commercial HVAC projects.

 

Unlike NRCA-MCH acceptance tests, NRCI-MCH forms are generally completed by the installing contractor rather than a separate certified acceptance testing technician.

 

Contractors should account for any required installation documentation before project closeout.

 

Certificates of Installation is checked, now there’s one final declaration to check: the Declaration of Required Certificates of Verification. 

 

Unlike installation forms, these may involve additional field testing by a certified Energy Code Compliance (ECC) Rater.

Declaration of Required Certificates of Verification

The final section to review is the Declaration of Required Certificates of Verification, which identifies any NRCV-MCH forms required for your project.

 

Unlike installation certificates, these forms document additional field verification and diagnostic testing under California’s Title 24 Energy Standards. 

 

This testing is commonly performed by a certified Energy Code Compliance (ECC) Rater, formerly known as a HERS Rater.

 

To identify these requirements, locate the verification declaration and review the forms listed under Form/Title, as highlighted in the example below.

Example of the declaration of required certificates of verification listed in the mechanical plans for the NRCC-MCH section.

In this example, two Certificates of Verification are listed: NRCV-MCH-27 for Indoor Air Quality and Mechanical Ventilation, and NRCV-MCH-32-H for Local Mechanical Exhaust.

 

These forms identify additional verification requirements that the contractor should account for when preparing the project estimate.

 

Important Note: Not every project requires NRCV forms. If the declaration states that no verification certificates are required, there may be no additional NRCV testing to arrange.

 

However, when forms are listed, contractors should verify the required testing scope and qualifications before scheduling.

 

Now that we’ve covered all three declaration types—Installation, Acceptance, and Verification—let’s return to our primary topic and explain what the different NRCA-MCH acceptance testing forms mean and the HVAC functions they evaluate.

List of All California NRCA-MCH Forms a Project May Require

You understand your project’s Mechanical Acceptance Testing requirements and where to find them, now you may be wondering what each listed form means.

 

Below is a list of NRCA-MCH forms under California’s 2025 Building Energy Efficiency Standards.

HVAC Airflow, Ventilation, and Controls

  • NRCA-MCH-02-A — Outdoor Air Ventilation
  • NRCA-MCH-03-A — Constant-Volume, Single-Zone HVAC
  • NRCA-MCH-04-A — Duct Leakage
  • NRCA-MCH-05-A — Economizer, DOAS, HRV, and ERV
  • NRCA-MCH-06-A — Demand Control Ventilation
  • NRCA-MCH-07-A — Supply Fan Variable Flow Controls

Hydronic Systems and Central Plant Controls

  • NRCA-MCH-08-A — Valve Leakage
  • NRCA-MCH-09-A — Water Temperature Reset
  • NRCA-MCH-10-A — Hydronic System Variable Flow Controls
  • NRCA-MCH-17-A — Condenser Water Temperature Reset Controls
  • NRCA-MCH-24-A — Cooling Tower Conductivity Controls

Energy Management and Advanced HVAC Controls

  • NRCA-MCH-11-A — Automatic Demand Shed Controls
  • NRCA-MCH-12-A — Packaged Unit Fault Detection and Diagnostics (FDD)
  • NRCA-MCH-13-A — AHU and Zone Terminal Fault Detection and Diagnostics
  • NRCA-MCH-14-A — Distributed Energy Storage DX Air Conditioning Systems
  • NRCA-MCH-15-A — Thermal Energy Storage
  • NRCA-MCH-16-A — Supply Air Temperature Reset Controls
  • NRCA-MCH-18-A — Energy Management Control System (EMCS)
  • NRCA-MCH-19-A — Occupied Standby Controls

Multifamily Mechanical Acceptance Testing

  • NRCA-MCH-20a-H — Multifamily Dwelling Ventilation Inspection
  • NRCA-MCH-20b-H — Multifamily Dwelling Kitchen Exhaust
  • NRCA-MCH-20c-H — Multifamily Indoor Air Quality Ventilation
  • NRCA-MCH-20d-H — Multifamily HRV and ERV
  • NRCA-MCH-21-H — Multifamily Enclosure Leakage
  • NRCA-MCH-22-A — Multifamily System Duct Leakage
  • NRCA-MCH-23-A — Heat Recovery and Energy Recovery Ventilation Verification

Important: Not every project requires every form. The required tests depend on the equipment, controls, project scope, and applicable California Energy Code cycle.

For a complete breakdown of testing procedures and requirements, visit our What Is Mechanical Acceptance Testing? page.

Final Thoughts

Understanding your project’s Title 24 requirements doesn’t have to be complicated once you know where to look. 

 

By locating the NRCC-MCH compliance documents and reviewing the required certificates, you can identify which Mechanical Acceptance Tests and additional verification requirements apply before they become unexpected expenses or inspection delays.

 

Whether you’re preparing a bid or getting ready for final inspection, identifying these requirements early can save time, prevent scheduling conflicts, and help keep your project moving forward.

 

Still unsure which NRCA-MCH forms your project requires? Vortex Air Balance Co. can help review your mechanical plans, identify the listed acceptance testing requirements, and provide a quote for the applicable services.

Frequently Asked Questions

Having trouble finding the NRCC-MCH documents doesn’t necessarily mean your project is exempt from California’s Title 24 requirements.

 

First, make sure you’re reviewing the complete set of construction plans. As discussed in Step 1, Title 24 compliance documentation may appear within the Mechanical Sheets (M-Sheets) or in a separate Energy Compliance section (T-Sheets).

 

If the documents are still missing, contact the mechanical engineer or Title 24 energy consultant responsible for the project. They can help determine whether the required compliance documents were prepared separately, omitted from your plan set, or are not applicable to your particular scope of work.

 

Never assume that missing paperwork automatically means Mechanical Acceptance Testing is not required.

Absolutely, and this is one of the most important details to understand when reviewing your project’s declaration pages.

 

A single rooftop air conditioning unit may require several different acceptance tests. For example, the same unit could require outdoor air ventilation verification, economizer testing, and fault detection testing.

 

Each required test has its own NRCA-MCH form. Additionally, when multiple HVAC units require the same test, the documentation may need to be completed separately for each applicable unit.

 

As explained in Step 2, one form number appearing in the declaration doesn’t necessarily mean only one test is required. A CMATT can review the equipment schedules and listed forms to determine the complete testing scope.

An inspector overlooking an acceptance testing requirement does not automatically eliminate that requirement.

 

California’s Title 24 Energy Standards establish mandatory acceptance tests for applicable mechanical systems. 

 

If your project’s approved compliance documentation identifies required NRCA-MCH forms, those tests generally remain necessary even when the inspector hasn’t specifically requested them.

 

It’s understandable why contractors may question an additional requirement that hasn’t been mentioned during inspections. 

 

However, the purpose of Mechanical Acceptance Testing extends beyond simply satisfying an inspector. It verifies that important HVAC control functions and energy-efficiency features operate as intended.

 

Vortex Air Balance Co. recommends completing all applicable acceptance tests identified in the project’s compliance documentation. 

 

These requirements exist to help ensure that the time and money invested in the mechanical design and installation result in properly functioning equipment.

Before a commercial construction project receives final approval, the enforcing agency may require documentation confirming completion of the applicable Title 24 acceptance tests.

 

Missing NRCA-MCH forms, unresolved testing deficiencies, or incomplete compliance documentation can delay the final inspection and project closeout.

 

This is why identifying the required forms early is so important. 

 

Contractors who discover the requirements shortly before their scheduled inspection may need additional time to arrange testing, correct deficiencies, and obtain completed documentation.

 

Scheduling Mechanical Acceptance Testing before the anticipated final inspection helps reduce the risk of unexpected delays. 

 

The local building department ultimately determines the applicable submission and approval procedures.

Testing, Adjusting, and Balancing (TAB) certification alone does not qualify a technician to perform California’s certified Mechanical Acceptance Testing requirements.

 

Although the two services involve evaluating HVAC system performance, they have different certification requirements.

 

A TAB contractor can also provide Mechanical Acceptance Testing when the company has appropriately certified personnel, such as a Certified Mechanical Acceptance Test Technician (CMATT), and satisfies the applicable certification program requirements.

 

For example, a company may employ technicians qualified to perform both certified air balancing and Title 24 mechanical acceptance tests.

 

The important distinction is that TAB certification and CMATT certification are separate qualifications. One does not automatically authorize the other.

A single company can provide both services when it maintains the appropriate certifications and qualified personnel for each testing program.

 

As explained earlier in this guide, NRCA-MCH forms document Mechanical Acceptance Testing, while NRCV-MCH forms document applicable field verification performed through the Energy Code Compliance (ECC) program.

 

A company providing both services must have properly qualified mechanical acceptance testing personnel and certified ECC Raters operating under the applicable program requirements.

 

However, holding a CMATT certification does not automatically qualify someone to perform ECC verification, and an ECC-Rater certification does not automatically authorize mechanical acceptance testing.

 

Contractors should confirm that the testing provider has the necessary qualifications for each service before scheduling.

Certain acceptance tests can be performed before the HVAC system has undergone complete Testing, Adjusting, and Balancing (TAB). 

 

 

However, some tests require established airflow rates or properly configured equipment to produce valid results.

 

 

For example, outdoor air ventilation verification may depend on airflow measurements and settings established during TAB. 

 

Other tests may primarily evaluate equipment control sequences or functional operation.

 

 

Whenever possible, complete the required air and hydronic balancing before scheduling Mechanical Acceptance Testing. 

 

 

This helps ensure the equipment is operating under the intended conditions.

 

 

Coordinating both services can also reduce unnecessary return visits and scheduling conflicts.

Lighting and mechanical acceptance testing are two separate Title 24 specialties, with different certification requirements and testing procedures.

 

Mechanical Acceptance Test Technicians evaluate applicable HVAC equipment and controls. Lighting Acceptance Test Technicians verify required lighting control functions, such as occupancy sensors, automatic shutoff, and daylight-responsive controls.

 

A CMATT certification alone does not authorize lighting acceptance testing. The technician must also hold the appropriate lighting acceptance certification.

 

However, a company may offer both services if it employs properly certified personnel and holds any contractor licenses required for the work it performs.

 

Be aware that Title 24 requirements extend beyond mechanical systems. Lighting, building envelope, and other applicable building systems may have separate compliance requirements. 

 

Reviewing the complete project documentation helps prevent overlooking these additional obligations.

Vortex Air Balance Co. provides certified Mechanical Acceptance Testing services for commercial HVAC projects throughout California.

 

Our mechanical acceptance testing personnel hold certification through the Refrigeration Service Engineers Society (RSES), a California Energy Commission-approved Acceptance Test Technician Certification Provider (ATTCP), subject to its applicable program approvals.

 

Services include applicable Title 24 mechanical acceptance tests, functional verification, deficiency documentation, and completion of the required NRCA-MCH forms.

 

Once you’ve located the acceptance testing requirements in your plans, Vortex can review the listed forms and equipment to determine the required testing scope and prepare an estimate.

 

Learn more about our Mechanical Acceptance Testing Services.