What Is Mechanical Acceptance Testing?
Mechanical Acceptance Testing (MAT) is the process of inspecting, testing, and verifying that commercial HVAC systems and controls operate in accordance with California’s Title 24 Building Energy Efficiency Standards. These tests evaluate equipment performance, control sequences, and energy-efficiency features to confirm that installed mechanical systems function as intended by the approved design. Mechanical Acceptance Testing is required for applicable new construction, tenant improvements, and mechanical alterations throughout California. Upon successful completion, Vortex Air Balance Co. completes the applicable NRCA-MCH forms to document compliance for building inspections and project closeout.
NRCA Testing We Currently Provide
Updated 10/27/2026
- NRCA-MCH-02-A Outdoor Air Acceptance
- NRCA-MCH-03-A HVAC and Heat Pumps – Constant Volume Single Zone HVAC
- NRCA-MCH-04-A Duct Leakage
- NRCA-MCH-05-A Economizer, Dedicated Outdoor Air System (DOAS), Heat Recovery Ventilator (HRV), and Energy Recovery Ventilator (ERV)
- NRCA-MCH-06-A Demand Control Ventilation
- NRCA-MCH-07-A Supply Fan Variable Flow Controls
- NRCA-MCH-08-A Valve Leakage Test
- NRCA-MCH-09-A Water Temperature Reset
- NRCA-MCH-10-A Hydronic System Variable Flow Controls
- NRCA-MCH-11-A Automatic Demand Shed Control
- NRCA-MCH-12-A Fault Detection and Diagnostics (FDD) – Packaged Units
- NRCA-MCH-13-A Air Handling Unit (AHU) and Zone Terminal Fault Detection and Diagnostics (FDD)
- NRCA-MCH-14-A Distributed Energy Storage Direct Expansion Air Conditioning (DX AC) Systems
- NRCA-MCH-15-A Thermal Energy Storage
- NRCA-MCH-16-A Supply Air Temperature Reset Controls
- NRCA-MCH-17-A Condenser Water Temperature Reset Controls
- NRCA-MCH-18-A Energy Management Control System (EMCS) Acceptance
- NRCA-MCH-19-A Occupied Standby
Important to Know
What Are NRCA Forms?
NRCA forms are California Title 24 Nonresidential Certificates of Acceptance used to document completed mechanical acceptance tests. These forms record test results and verify that applicable commercial HVAC systems and controls meet the required acceptance criteria. Completed NRCA forms serve as compliance documentation for building inspections and project closeout.
What Is Title 24?
Title 24 is California’s Building Standards Code, which establishes construction, safety, and energy-efficiency requirements. Part 6 regulates building energy performance, including commercial HVAC systems and controls. Applicable systems must meet these standards, which may require mechanical acceptance testing to verify proper operation and compliance.
MAT Terminology
Common Mechanical Acceptance Testing abbreviations include MAT (Mechanical Acceptance Testing), MATT (Mechanical Acceptance Test Technician), CMATT (Certified Mechanical Acceptance Test Technician), ATTCP (Acceptance Test Technician Certification Provider), NRCA (Non-Residential Certificate of Acceptance), MCH (Mechanical), and TAB (Testing, Adjusting, and Balancing).
What Is an ATTCP?
An Acceptance Test Technician Certification Provider (ATTCP) is a California Energy Commission-approved organization that trains, certifies, and oversees technicians performing Title 24 acceptance testing. Vortex Air Balance Co. has RSES-certified acceptance testing personnel, qualified to perform applicable mechanical acceptance tests and provide the required compliance documentation.
What Does a Mechanical Acceptance Testing Technician Do?
A certified Mechanical Acceptance Test Technician (MATT) is responsible for inspecting, testing, and verifying that commercial HVAC systems and controls operate in accordance with California’s Title 24 energy requirements. The technician reviews approved mechanical plans, performs functional tests, and verifies equipment operation, control sequences, and energy-efficiency features under the required testing conditions. Any failed tests or deficiencies are documented for corrective action and retesting. Upon successful completion, the technician completes the applicable NRCA-MCH acceptance forms to document compliance for building inspections and project closeout.
What Doesn't a MAT Technician Do?
A Mechanical Acceptance Test Technician is not responsible for performing mechanical repairs, equipment installation, or control system programming. If equipment fails an acceptance test, the technician documents the deficiencies and identifies the conditions preventing compliance. The responsible mechanical or controls contractor must complete any necessary corrections before retesting can proceed. MAT technicians also do not approve engineering design changes or guarantee code compliance for systems outside the scope of their required acceptance tests.
Schedule Your Testing Today!
- Fast Service
- SoCal & Bay Area Focused
- We Service all of California
Why Is Mechanical Acceptance Required?
Mechanical Acceptance Testing is required under California’s Title 24 Energy Standards to ensure commercial HVAC systems operate as designed and meet mandatory energy-efficiency requirements. Critical installation details, control sequences, and energy-saving features can sometimes be overlooked, improperly configured, or left unverified during construction and inspections.
A Certified Mechanical Acceptance Test Technician (CMATT) provides an additional level of verification by testing these functions and confirming that applicable mechanical systems operate as intended. This process also helps identify deficiencies that may remain after installation and TAB, holding the project team accountable for delivering properly functioning, energy-compliant HVAC systems.
How To Ensure Your HVAC Project Is Prepared For Mechanical Acceptance Testing?
Proper preparation helps prevent failed tests, unnecessary return visits, and delays in obtaining the required Title 24 compliance documentation. Please verify the following before scheduling your mechanical acceptance test:
- Mechanical Installation Complete: All HVAC equipment, ductwork, piping, dampers, sensors, and associated components are properly installed.
- Equipment Startup Complete: Applicable HVAC equipment has completed manufacturer-required startup procedures and operates without unresolved faults.
- TAB Services Complete: Required air and hydronic balancing has been performed, and the TAB reports are available for review.
- Controls Fully Operational: Thermostats, sensors, actuators, control valves, and building automation systems function as intended.
- Control Sequences Verified: The controls contractor has checked applicable economizer, demand control ventilation, fan operation, and other required sequences.
- Required Testing Access Provided: Equipment, control panels, sensors, and testing locations are accessible.
- Approved Documents Available: Mechanical plans, equipment schedules, control sequences, and applicable Title 24 compliance forms are available.
- Controls Contractor Available: Qualified personnel can assist with overrides, setpoint adjustments, and functional testing when required.
- Roof Access Provided: Safe and unobstructed access to rooftop HVAC equipment must be available, including roof hatches, ladders, access keys, and any required safety provisions. All rooftop equipment requiring acceptance testing must be accessible to the technician.
Additional California Services We Offer
Mechanical Acceptance FAQ
Does Every Commercial HVAC System Require Mechanical Acceptance Testing?
California Title 24 establishes different acceptance testing requirements depending on the HVAC equipment, system capacity, control features, and scope of construction. Not every commercial HVAC installation requires the same tests.
For example, systems equipped with economizers may require economizer acceptance testing, while other installations may require outdoor air ventilation verification or demand control ventilation testing. The approved mechanical plans, applicable Energy Code, and project compliance documentation determine which NRCA-MCH tests are required.
How Long Does Mechanical Acceptance Testing Take?
Testing duration varies based on the number of HVAC systems, required acceptance tests, and overall project readiness. Smaller commercial projects may take several hours, while larger facilities with multiple rooftop units, air handlers, and complex controls may require several days.
Incomplete equipment startup, nonoperational controls, or unresolved mechanical deficiencies can extend testing time. Scheduling the service after equipment startup and required TAB work helps minimize delays and unnecessary return visits.
Is TAB the Same as Mechanical Acceptance Testing?
No. Testing, Adjusting, and Balancing (TAB) and Mechanical Acceptance Testing (MAT) are two separate HVAC services that serve different purposes. TAB focuses on measuring and adjusting airflow (CFM) and water flow (GPM) to achieve the engineer’s design requirements. MAT verifies that applicable HVAC equipment, controls, and energy-efficiency features operate in accordance with California’s Title 24 Energy Standards.
Although both services verify mechanical system performance, MAT does not replace TAB, and TAB does not replace MAT. Many commercial HVAC projects require both services for proper system operation and project compliance.
Can Mechanical Acceptance Testing Be Performed Before TAB Is Completed?
Certain acceptance tests can proceed before Testing, Adjusting, and Balancing (TAB) is complete. However, procedures involving airflow verification, ventilation rates, or equipment performance may depend on completed TAB work.
Ideally, contractors should complete the required air and hydronic balancing before scheduling acceptance testing. This allows technicians to evaluate equipment under the intended operating conditions and reduces the likelihood of failed tests or additional site visits.
What Happens If an HVAC System Fails Mechanical Acceptance Testing?
Failed acceptance tests indicate that equipment or controls did not satisfy one or more applicable testing criteria. Common causes include incorrect control sequences, malfunctioning sensors, incomplete installations, or improper equipment operation.
The technician documents the deficiencies and identifies the conditions preventing successful completion. The responsible mechanical or controls contractor must perform the necessary corrections. Once resolved, the affected tests can be repeated to verify that the system meets the required acceptance criteria.
Can Mechanical Acceptance Testing Delay Final Building Inspection?
Incomplete or unsuccessful Mechanical Acceptance Testing may delay final building approval when the project requires Title 24 acceptance documentation. Building departments generally require applicable acceptance tests and compliance forms before completing the final approval process.
Contractors should coordinate testing before the anticipated final inspection date. Allowing sufficient time for deficiency corrections, retesting, and documentation helps prevent avoidable scheduling delays.
When Are Completed NRCA Forms Issued?
Following successful completion of the required acceptance tests, the technician finalizes the applicable NRCA-MCH forms to document testing results and compliance with the acceptance criteria.
Vortex Air Balance Co. prioritizes fast turnaround times and strives to deliver completed acceptance documentation as quickly as possible. However, any outstanding deficiencies must be corrected and successfully retested before the affected forms can be finalized. Required regulatory submissions and deadlines remain subject to applicable compliance procedures.
Can Mechanical Acceptance Testing Be Performed on Existing Buildings?
Existing commercial buildings may require Mechanical Acceptance Testing when HVAC equipment is replaced, modified, or upgraded as part of a permitted project subject to California Title 24.
Common examples include rooftop unit replacements, tenant improvements, economizer installations, and control system upgrades. Testing requirements depend on the equipment involved, project scope, and applicable Energy Code provisions. Existing equipment does not automatically require acceptance testing simply because it remains in operation.
What Is the Difference Between Mechanical Acceptance Testing and Commissioning?
Mechanical Acceptance Testing verifies specific HVAC functions and control sequences required by California Title 24. Technicians follow established acceptance procedures and document the results using the applicable compliance forms.
Commissioning provides a broader evaluation of building system performance, including installation, startup, equipment integration, and operational sequences.
Although these services overlap, acceptance testing does not replace a complete commissioning program. Depending on the project, both may be necessary to satisfy construction and performance requirements.
Does Vortex Air Balance Co. Also Perform TAB?
In addition to Mechanical Acceptance Testing, Vortex Air Balance Co. provides professional Testing, Adjusting, and Balancing (TAB) services for commercial HVAC systems throughout California.
Services include air balancing, hydronic balancing, fan performance verification, and certified TAB reporting. These procedures establish and document required airflow rates (CFM) and water flow rates (GPM) throughout applicable mechanical systems.
Combining TAB expertise with acceptance testing capabilities allows Vortex to support multiple stages of mechanical system verification.
Can Vortex Combine TAB and Mechanical Acceptance Testing Services?
Contractors can schedule both Testing, Adjusting, and Balancing (TAB) and Mechanical Acceptance Testing (MAT) through Vortex Air Balance Co., simplifying coordination between these closely related services.
Projects combining TAB and MAT may qualify for substantial package discounts, particularly when testing can be coordinated during the same site visits. This approach can reduce scheduling conflicts, streamline communication, and simplify project closeout.
Package pricing depends on equipment quantities, required tests, project location, and overall scope of work.
Where in California Does Vortex Provide Mechanical Acceptance Testing?
Vortex Air Balance Co. provides certified Mechanical Acceptance Testing services throughout California, with a primary focus on Southern California, the San Francisco Bay Area, and Greater Sacramento.
Southern California: Los Angeles, Orange, Riverside, San Bernardino, San Diego, Ventura, Santa Barbara, San Luis Obispo, Kern, and Imperial Counties.
San Francisco Bay Area: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma Counties.
Greater Sacramento: Sacramento County and surrounding communities.
Our team serves commercial new construction, tenant improvements, and mechanical alteration projects across these regions, providing professional Title 24 acceptance testing and compliance documentation.