Arial view of the Fresno County Plaza Building in california.

Fresno County
TAB & Mechanical Acceptance Testing

Commercial TAB and Title 24 Mechanical Acceptance Testing are available throughout Fresno County for system verification and project closeout.

NCI Certified

TAB Professional

RSES Certified

Title 24 MAT Experts

Serving All of

the County

Certified Reports

Same-Day Service

Our Fresno County Services

Projects receive commercial TAB and Mechanical Acceptance Testing for measured system performance and required closeout documentation.

Air Balancing

Commercial TAB measures and adjusts air systems according to the confirmed project scope.

Hydronic Balancing

Hydronic TAB verifies flow through commercial chilled-water and hot-water systems and records accessible balancing adjustments.

Mechanical Acceptance Testing

Mechanical Acceptance Testing verifies applicable HVAC equipment and controls through required Title 24 procedures and NRCA documentation.

Commercial Air Balancing Services in Fresno County

HVAC System Air Balancing

Measured airflow balancing for commercial heating and cooling systems.

Restaurant Hood Certification

Restaurant hood airflow testing and certification for applicable inspection requirements.

Fume Hood Testing

Measured airflow testing and balancing for commercial laboratory fume hoods.

Air Balance Reports

Fresno County TAB reports record tested systems, design values, measured airflow, adjustments, and final results.

Hydronic System Balancing

Chilled Water Systems

Testing and balancing for commercial chilled-water HVAC systems.

Hot Water Systems

Testing and balancing for commercial hot-water heating systems.

Hydronic TAB Reports

Fresno County hydronic TAB reports document design flow, measured water-side results, final settings, and field observations.

Title 24 Mechanical Acceptance Testing in Fresno County

Mechanical Acceptance Testing in Fresno County follows the procedures identified in the project compliance documents. Results are recorded on the applicable NRCA forms for the confirmed scope.

Testing and Closeout Support

Testing requirements depend on the installed equipment, compliance documents, code cycle, confirmed scope, and current technician and employer qualifications.

  • NRCA-MCH-02-A Outdoor Air Acceptance
  • NRCA-MCH-03-A HVAC and Heat Pumps – Constant Volume Single Zone HVAC
  • NRCA-MCH-04-A Duct Leakage
  • NRCA-MCH-05-A Economizer, Dedicated Outdoor Air System (DOAS), Heat Recovery Ventilator (HRV), and Energy Recovery Ventilator (ERV)
  • NRCA-MCH-06-A Demand Control Ventilation
  • NRCA-MCH-07-A Supply Fan Variable Flow Controls
  • NRCA-MCH-08-A Valve Leakage Test
  • NRCA-MCH-09-A Water Temperature Reset
  • NRCA-MCH-10-A Hydronic System Variable Flow Controls
  • NRCA-MCH-11-A Automatic Demand Shed Control
  • NRCA-MCH-12-A Fault Detection and Diagnostics (FDD) – Packaged Units
  • NRCA-MCH-13-A Air Handling Unit (AHU) and Zone Terminal Fault Detection and Diagnostics (FDD)
  • NRCA-MCH-14-A Distributed Energy Storage Direct Expansion Air Conditioning (DX AC) Systems
  • NRCA-MCH-15-A Thermal Energy Storage
  • NRCA-MCH-16-A Supply Air Temperature Reset Controls
  • NRCA-MCH-17-A Condenser Water Temperature Reset Controls
  • NRCA-MCH-18-A Energy Management Control System (EMCS) Acceptance
  • NRCA-MCH-19-A Occupied Standby

Frequently Asked Questions

Fresno County TAB measures and adjusts airflow or water flow against project design values. Mechanical Acceptance Testing verifies applicable equipment and controls through defined California Energy Code procedures. A project may require either service or both.

Fresno County projects may require TAB when approved plans, specifications, engineer notes, permit documents, or the reviewing authority call for measured HVAC system verification. The exact requirement depends on the project.

Vortex provides commercial air balancing throughout Fresno County, including every incorporated city listed below:

  • Clovis
  • Coalinga
  • Firebaugh
  • Fowler
  • Fresno
  • Huron
  • Kerman
  • Kingsburg
  • Mendota
  • Orange Cove
  • Parlier
  • Reedley
  • San Joaquin
  • Sanger
  • Selma

Mechanical Acceptance Testing is separate from Fresno County TAB. It is included only when required by the compliance documents and confirmed project scope.

Fresno County Mechanical Acceptance Testing must be performed by technicians and employers holding the qualifications required for the applicable California Energy Code procedures. Vortex uses current RSES Mechanical Acceptance Test Technician and Employer qualifications for the procedures within the confirmed scope.

Fresno County TAB should be performed by qualified personnel using calibrated instruments and the approved project documents. Specifications may require certification through NCI, AABC, or NEBB. Vortex uses NCI-certified TAB professionals.

Yes. TAB and Mechanical Acceptance Testing can be coordinated under one confirmed scope when the required acceptance procedures fall within current qualifications.

CONTACT US

Tell us whether your project needs TAB, Mechanical Acceptance Testing, or both.