Stunning arial view of downtown Merced, CA in Merced County, a location Vortex Air Balance Co. is proud to provide TAB and Mechanical Acceptance Testing in.

Merced County
TAB & Mechanical Acceptance Testing

Commercial testing and balancing (TAB) and Title 24 Mechanical Acceptance Testing support HVAC verification and project closeout throughout Merced County. Certified TAB Reports and NRCA Forms.

NCI Certified

TAB Professional

RSES Certified

Title 24 MAT Experts

Serving All of

the County

Certified Reports

Same-Day Service

Our Merced County Services

Projects receive measured TAB results and required Mechanical Acceptance Testing documentation for the confirmed scope.

Air Balancing

Commercial TAB measures and adjusts air systems against the approved design values.

Hydronic Balancing

Hydronic TAB measures water flow and records balancing adjustments for accessible system components.

Mechanical Acceptance Testing

Mechanical Acceptance Testing verifies applicable equipment and controls through required Title 24 procedures.

Commercial Air Balancing Services in Merced County

HVAC System Air Balancing

Commercial HVAC airflow is measured, adjusted, and documented against project targets.

Restaurant Hood Certification

Restaurant hood airflow testing and certification for applicable inspection requirements.

Fume Hood Testing

Laboratory fume hood airflow testing and balancing for the confirmed scope.

Air Balance Reports

Merced County TAB reports summarize design values, measured airflow, final settings, and test results.

Hydronic System Balancing

Chilled Water Systems

Water-side testing and balancing for commercial chilled-water systems.

Hot Water Systems

Water-side testing and balancing for commercial hot-water systems.

Hydronic TAB Reports

Merced County hydronic TAB reports record design flow, measured results, balancing adjustments, and final settings.

Title 24 Mechanical Acceptance Testing in Merced County

Mechanical Acceptance Testing in Merced County follows the required procedures listed in the project compliance documents. Applicable results are recorded on NRCA forms.

Testing and Closeout Support

Requirements depend on the installed equipment, compliance documents, code cycle, confirmed scope, and current technician and employer qualifications.

  • NRCA-MCH-02-A Outdoor Air Acceptance
  • NRCA-MCH-03-A HVAC and Heat Pumps – Constant Volume Single Zone HVAC
  • NRCA-MCH-04-A Duct Leakage
  • NRCA-MCH-05-A Economizer, Dedicated Outdoor Air System (DOAS), Heat Recovery Ventilator (HRV), and Energy Recovery Ventilator (ERV)
  • NRCA-MCH-06-A Demand Control Ventilation
  • NRCA-MCH-07-A Supply Fan Variable Flow Controls
  • NRCA-MCH-08-A Valve Leakage Test
  • NRCA-MCH-09-A Water Temperature Reset
  • NRCA-MCH-10-A Hydronic System Variable Flow Controls
  • NRCA-MCH-11-A Automatic Demand Shed Control
  • NRCA-MCH-12-A Fault Detection and Diagnostics (FDD) – Packaged Units
  • NRCA-MCH-13-A Air Handling Unit (AHU) and Zone Terminal Fault Detection and Diagnostics (FDD)
  • NRCA-MCH-14-A Distributed Energy Storage Direct Expansion Air Conditioning (DX AC) Systems
  • NRCA-MCH-15-A Thermal Energy Storage
  • NRCA-MCH-16-A Supply Air Temperature Reset Controls
  • NRCA-MCH-17-A Condenser Water Temperature Reset Controls
  • NRCA-MCH-18-A Energy Management Control System (EMCS) Acceptance
  • NRCA-MCH-19-A Occupied Standby

Frequently Asked Questions

Merced County TAB establishes measured airflow or water flow and adjusts systems toward approved design values. Mechanical Acceptance Testing checks applicable equipment and controls through defined California Energy Code procedures. Either service or both may be required.

A Merced County project may require TAB when the plans, specifications, permit documents, engineer, or reviewing authority require measured HVAC system verification. The governing project documents determine the scope.

Vortex provides commercial air balancing throughout Merced County, including every incorporated city listed below:

  • Atwater
  • Dos Palos
  • Gustine
  • Livingston
  • Los Banos
  • Merced

Mechanical Acceptance Testing is a separate service from Merced County TAB. It is added when the compliance documents identify required acceptance procedures within the confirmed scope.

Merced County Mechanical Acceptance Testing requires technicians and employers with the qualifications specified for the applicable California Energy Code procedures. Vortex uses current RSES Mechanical Acceptance Test Technician and Employer qualifications for procedures within its confirmed scope.

Merced County TAB should follow the approved plans, project specifications, and enforcing-agency requirements. Specifications may call for NCI, AABC, or NEBB certification. Vortex uses NCI-certified TAB professionals and calibrated instruments.

Yes. TAB and Mechanical Acceptance Testing can be scheduled under one confirmed scope when the required acceptance procedures fall within current qualifications.

CONTACT US

Tell us whether your project needs TAB, Mechanical Acceptance Testing, or both.